Our Brochure
Download
Installation
- Delivery & Off-loading of Switchboards via HIAB Mounted Vehicles
- Sitting & Positioning of LV Switchboards
- Re-bolting split sections together once they are in positions
- Re-connecting of Internal Wiring
- Flash testing
- Meggar Testing
Modifications & Installation of:
- ACB’s Fitted or upgraded
- MCCB’s Fitted or upgraded
- Fuse Switches fitted or upgraded
- Metering Installed or upgraded including CT’s
- Electronic Surge Protection
- Converting manual changeovers to automatic controls
- Standard Controls
- Motorising devices such as MCCB’s / ACB’s. (For load shedding purposes etc)
- Power Factor Correction
- Switch Board Extensions
- Replacing obsolete or malfunctioning MCCB’s / ACB’s / Fuse switches
- Sheet Metal work / Copper work modifications manufactured to suit any of the above switch replacements that are not a straight replacement or additional coppers to assist in cabling of the switches