Service Image

Installation

  • Delivery & Off-loading of Switchboards via HIAB Mounted Vehicles
  • Sitting & Positioning of LV Switchboards
  • Re-bolting split sections together once they are in positions
  • Re-connecting of Internal Wiring
  • Flash testing
  • Meggar Testing

Modifications & Installation of:

  • ACB’s Fitted or upgraded
  • MCCB’s Fitted or upgraded
  • Fuse Switches fitted or upgraded
  • Metering Installed or upgraded including CT’s
  • Electronic Surge Protection
  • Converting manual changeovers to automatic controls
  • Standard Controls
  • Motorising devices such as MCCB’s / ACB’s. (For load shedding purposes etc)
  • Power Factor Correction
  • Switch Board Extensions
  • Replacing obsolete or malfunctioning MCCB’s / ACB’s / Fuse switches
  • Sheet Metal work / Copper work modifications manufactured to suit any of the above switch replacements that are not a straight replacement or additional coppers to assist in cabling of the switches